ISO Certificate (01/01-2020)
Dan-Equip A/S has per 01-01-2020 been re-approved to confirm to the Quality Management System standard: DS/EN ISO 9001:2015.
New certificate will be uploaded as soon as possible.
________________________________________________________
Reception (01-03-2017)
20 Years Anniversary
Blue Water Arena, Esbjerg.
_____________________________________________________________
ISO Certificate (11/01-2017)
Dan-Equip A/S has per 02-01-2017 been approved to confirm to the Quality Management System standard: DS/EN ISO 9001:2015.
_____________________________________________________________
Delivery (01/05-2016)
Due to reducing the staff, we cannot deliver goods by our truck to the same extent as we have done previously. There will still be daily delivery. Inquire about delivery times when you are speaking to one of our sales.
_____________________________________________________________
Cleaning Fluids (24/9-2013)
Cleaning Fluids, NEW Maxi 3 industrirens. Click here
_____________________________________________________________
Offshore-gratings and -steps (14/6-2013)
Now we have offshore-gratings and -steps at stock. Click here
_____________________________________________________________
Update overview (28/8-2011)
• The product overview regarding structural steel has been updated.
It is now possible to see if the different profiles and dimensions are in stock in Esbjerg, Denmark. It is also possible to see the length, surface treatment (short blasted and primed or not) and grade of material that the profiles are stocked in.
Now we have offshore-gratings and -steps at stock. Click here
• The product overviews regarding fittings for welding (ANSI spec.) and
forged steel fittings, threaded, have also been updated.
Click on the section “Products” in the menu bar to the left to find the
product overviews regarding fittings for welding (ANSI spec.) and
forged steel fittings, threaded.
• The sections “Find us” and “Jobs” have been added to the homepage.
_____________________________________________________________
Newly built warehouse and renovated office spaces (20/7-2011)
We have just completed a new warehouse on 800 square meters. The warehouse contains primarily pipes and structural steel. At the same time the office building has been expanded with a top floor and the old office spaces have been renovated.